Access to Tisch Library limited for interior work

Posted: Thu, Jun 9th 2022

The second floor of Tisch Library will have new carpeting installed starting on July 13 and continuing through August 22. The library will remain open during this period, but the carpeted area of Tisch past the lobby will be closed starting July 13. The Hirsh Reading Room will remain open.  

From July 13 through August 22, there will be no access to second floor computers, printers, and study areas, or reference, DVD, oversize, and fine arts stacks. Please plan to use interlibrary loan services to request fine arts books, oversize books, and DVDs during this period, or visit the library by July 12 to borrow these materials.  

Computers are available in the Digital Design Studio on level 3 (Macs) or the Data Lab on level 2 (PCs). Printers are available on level 1. Level 1 group study rooms can be reserved via Reserve Tufts.  

Course reserves, hold pickup, interlibrary loan, scan & deliver, and technology borrowing will be limited while carpeting at the Front Desk is being replaced from July 20 to July 22.  

If you have questions please ask at the Front Desk, call 617-627-3347 or Ask a Librarian